Call details:

Demonstration for Long-duration Battery Energy Storage Systems (BATT4EU Partnership)

HORIZON-CL5-2027-05-D2-08

Objective and scope

Demonstrate innovative battery systems that provide more than eight hours of storage for electricity networks and major industrial users. The topic supports European energy security, renewable integration and more resilient electricity supply, with less dependence on critical raw materials.

Scope of activities

Projects are expected to cover all the following areas:

  • Technology demonstration: validate storage concepts that are not yet commercial, including novel redox-flow, high-temperature, metal-air or multivalent systems.
  • Use cases: assess grid-scale storage, large industrial consumers or firming renewable generation, with quantified benefits for resilience, emissions, safety and cost.
  • Hybrid systems: examine complementary storage technologies and their contribution to performance and lifetime.
  • Materials and manufacturing: prioritise abundant, affordable and sustainable materials, reliable European supply chains and credible production scale-up.
  • Digital management: improve charge, health and lifetime prediction through battery and energy management systems.
  • Economic assessment: compare measured performance, investment and operating costs with commercial alternatives.
  • System safety: assess hazards and mitigation before wider adoption, using Safe and Sustainable by Design as a reference.

Expected results and deployment

Produce reproducible operational evidence supporting grid stability, flexibility and a European stationary-storage deployment strategy. Exploitation planning should address feasibility, business models, commercialisation and possible follow-on investment, including the Innovation Fund.

Projects contribute to the BATT4EU Partnership and must report relevant results for monitoring its performance indicators.

Technology maturity: activities may start at any TRL and should reach TRL 6–7 by project completion.

Eligible applicants

Battery and materials developers, SMEs, start-ups, large companies, energy businesses, industrial users, universities, research organisations, public bodies and other eligible legal entities can participate, subject to Horizon Europe conditions.

A standard collaborative consortium normally requires at least three independent legal entities from three different EU Member States or Associated Countries, including at least one entity established in an EU Member State. Check each partner’s participation and funding eligibility against the General Annexes and topic conditions.

The Joint Research Centre may contribute battery-performance or safety research after selection, as a beneficiary receiving no funding or as an associated partner. It does not participate in preparing or submitting the proposal. Where satellite-based observation or positioning services are used, the applicable Copernicus and Galileo/EGNOS requirements apply.

Consortium profiles

Potential partners include storage-technology developers, cell and component manufacturers, materials suppliers, system integrators, electricity-network and renewable-energy operators, industrial demonstration hosts, digital-control specialists and testing organisations. The partnership should provide the technical capabilities and sites needed to demonstrate and assess the complete system.

Eligible costs

Plan resources for technology development, integration, demonstration, testing, safety assessment and exploitation. Personnel, justified subcontracting, equipment use and other purchases or services must meet the applicable grant rules. Explain how costs support the work packages and distinguish project development activities from subsequent commercial rollout.

Funding

  • Type of action: Innovation Action (IA).
  • Indicative topic budget: €18.8 million.
  • Expected EU contribution per project: around €9.4 million; different amounts may also be considered.
  • Indicative number of projects: 2.
  • Funding rate: up to 70% for profit-making entities and up to 100% for non-profit legal entities.

Specific grant provisions allow the granting authority to object to a transfer of ownership or exclusive licensing of results for up to four years after the action ends.

Deadline for submission

Deadline: 15 September 2027, 17:00 Brussels time (CEST).
Submission procedure: single-stage.

Forthcoming
Company size: Battery and energy companies, industrial users, SMEs, start-ups, universities and research organisations in international consortia
Issuer: European Climate, Infrastructure and Environment Executive Agency
Area: Climate and energy, Advanced Manufacturing
Call type: Innovation Action (IA)
Co-funding: Up to 70% (100% for non-profit entities)
Date published: 5 May 2027
Deadline for submission: 15 September 2027, 17:00 Brussels time

Increase your chances - contact us.

Contact us